The Allkare Group, Bulding Contractors, Property Drying Out, Carpet Cleaning and Upholstery, Plumbing, Heating and Drainage

TES - flood drying system

TES

Thermal Drying Systems Used By Allkare

Wedding reception case study

  • Area: 6,000 sq ft
  • Class: 3-4 sewage and black water flood
  • 8pm Thursday: We set up TES
  • 10pm Saturday: TES pulled
  • Overall time to dry: 50 hours

How much did this save the reception event owners?

How much did this save the reception event owners?